    Detect, calculate and draft formally sound change orders.

    Change order detection, calculation and drafting under VOB/B (the German standard terms for construction contracts, Part B), straight from the project context.

    How Structify solves it

    One connected path instead of an isolated tool.

    A change order (Nachtrag under VOB/B) is an additional or changed service compared with the original construction contract. Structify flags potential change orders from the project history, calculates them under VOB/B Section 2 and drafts a formally sound change order notice.

    • Detection. Deviations and additional services surfaced early.
    • Calculation. Change order value calculated traceably under VOB/B.
    • Drafting. A formally sound change order notice at the push of a button.
    Matching product

    You handle this task in Structify, in the same project as fees, award and acceptance.

    See Structify Desktop
    AI-generated image: meeting at a conference table
    Solution · Change orders

    From the first idea to acceptance, in one system.

    Frequently asked questions

    Change order management, briefly explained.

    Under VOB/B Section 2; the calculation stays traceable and correctable.

    Structify flags potential change orders from the project history; the decision stays with you.

    Yes, a formally sound change order notice is generated directly.