Detect and calculate change orders and draft the notice.
Change order detection, calculation and drafting under VOB/B (the German standard terms for construction contracts, Part B), straight from the project context.
A change on site.
Detected, calculated, drafted.
Detection.
Calculation.
Drafting.
From cause to change order.
One connected path instead of an isolated tool.
A change order (Nachtrag under VOB/B) is an additional or changed service compared with the original construction contract. Structify flags potential change orders from the project history, calculates them under VOB/B Section 2 and drafts a change order notice for you to review.
- Detection. Deviations and additional services surfaced early.
- Calculation. Change order value calculated traceably under VOB/B.
- Drafting. A draft change order notice at the push of a button.
You handle this task in Structify, in the same project as fees, award and acceptance.
See StructifyFrom the first idea to acceptance, in one system.
Change order management, briefly explained.
Under VOB/B Section 2; the calculation stays traceable and correctable.
Structify flags potential change orders from the project history; the decision stays with you.
Yes, a draft change order notice is generated directly; you review and send it.